Latest News

Arqaam quotes NCLE : Riyadh construction is proceeding as planned

Magazines

Most popular
You May Like to Know
Join the Newsletter

Be updated to the latest news and posts

In an interview with Arqaam, Mr. Khalid bin Mohammad Al-Khudair, Chairman of the Board of Directors for the National Company for Learning and Education (NCLE), stated that construction in Riyadh is on track as per the planned schedule. Al-Khudair revealed that the school complexes’ construction is progressing well, and he expects the projects to commence operations between 2024 and 2025. Highlighting a positive trend, he mentioned a rise in student enrollments across all school complexes, both existing and newly opened ones, contributing to a notable increase in net profit for the first quarter.

Related Posts

Magazines

National Company for Learning and Education announces its Interim Financial results for the Period Ending on 2025-01-31 ( Six Months )

The increase in net profit during the current period by 20% compared to same period of the previous year is due to an increase in revenue by 16% compared to the same period of the previous year.

Magazines

اعلان الشركة الوطنية للتربية و التعليم عن النتائج المالية الأولية للفترة المنتهية في 2025-01-31 ( ستة أشهر )

إن ارتفاع صافي الربح في الفترة الحالية بنسبة 20% مقارنة بالفترة المماثلة من العام السابق جاء بسبب ارتفاع الإيرادات لهذه الفترة بنسبة 16% مقارنة بالفترة المماثلة من العام السابق

Magazines

الوطنية للتعليم تحتفي بيوم التأسيس فخرًا بتاريخ المملكة وتراثها

فخرًا واعتزازًا بمملكتنا الحبيبة كل عام ووطننا بأمن ورخاء